Tracked Farming Tractor
Tracked Farming Tractor Tracked Farming Tractor Tracked Farming Tractor Tracked Farming Tractor Tracked Farming Tractor Tracked Farming Tractor Tracked Farming Tractor Tracked Farming Tractor
Product Information

Tracked Farming Tractor

Most enquiries about the tiller start with a job rather than a machine. Someone has a site, a material and a deadline, and the specification follows from those three. This page works back from the job to the build sheet.

Engine and power options behind tracked farming tractor

Emissions documentation is part of engine selection for some destinations. Confirming which units can be supplied and documented for the destination country is worth doing at enquiry stage rather than after the build sheet is signed.

Upgrading and reconfiguring tracked farming tractor

tracked farming tractor view 1

Upgrades should be checked against the base machine. Hydraulic capacity, mounting interface and stability all limit what can reasonably be added to this class of machine, and confirming those limits avoids an unsatisfactory result. The decision is economic as well as technical. Comparing the work of reconfiguring the unit in daily use against a different machine is a short calculation that usually gives a clear answer.

Fuel use and running demands of tracked farming tractor

Consumption is best measured over a full week rather than judged per hour. Idle time, repositioning and waiting for other trades are often the largest share of the fuel a machine of this size burns on a site.

Engine and power options behind tracked farming tractor tracked farming tractor

Orchard, vineyard and row crop use of tracked farming tractor

Row crop work also means working around obstacles. Guards, lighting and a clear view from the seat are what let the equipment on site work close to trunks and posts without damage to either.

Safe working practice around tracked farming tractor

Slopes and edges deserve a separate check. The machine itself that is stable on level ground behaves differently across a gradient, and the safe working angle is a number worth knowing rather than estimating. Personal protective equipment and a stop rule are simple controls. Agreeing before work starts that anyone can stop the job is the single measure that most often prevents a serious incident near the model in question.

tracked farming tractor view 3

Transporting tracked farming tractor to and between sites

Shipping dimensions matter as much on export orders as they do locally. Confirming the packed size of the machine in that duty before booking avoids re-booking freight after the machine is built.

Parts, service and support for tracked farming tractor

Upgrading and reconfiguring tracked farming tractor tracked farming tractor

Support after delivery is a parts question. Filters, belts, hoses and the wearing items specific to the unit on the job are what a buyer should plan to hold before the first service interval rather than order after a failure.

Soil conditions and how tracked farming tractor works the ground

Tillage quality starts with the soil, not the machine. Dry, friable ground breaks up in one pass, while the same the equipment in service on heavy wet clay needs a second pass and a lower gear, so the ground survey belongs before the working width is chosen. Soil moisture decides the outcome more than power does. Working a machine built for the work when the ground is too wet smears the furrow and compacts below it, and the damage shows up in the following crop rather than in the same week. The working pass should follow the field. Running the tiller along the contour on a slope and across the previous pass on the flat gives a more even tilth than following the same line every season.

Warranty, commissioning and early checks

tracked farming tractor view 5

Warranty terms are clearer when they are read before purchase. Knowing what is covered, what counts as a wearing item and what documentation is required makes a claim on this class of machine straightforward rather than contested. Early faults are usually simple. The unit in daily use that behaves differently in its first few hours is more often mis-set than defective, and a call to the supplier at that point usually resolves it the same day.

Matching a machine of this size to ground conditions

The working surface should be surveyed before the machine itself is specified. A machine that is stable on compacted gravel can be unusable on the same site after rain, and the difference shows up as lost days rather than as a fault. Traction and flotation are two separate questions. The equipment on site may have the power for a slope and still not have the grip, so the surface, not the engine rating, is usually what limits the working day.

Fuel use and running demands of tracked farming tractor tracked farming tractor

Dust, mud and abrasive conditions around the model in question

Abrasive conditions shorten service intervals. Air filters, seals and any exposed sliding surface on the machine in that duty need attention more often in dusty or muddy work, and the extra checks prevent far more wear than the time they take. Sealed points and guarded areas deserve a look in these conditions. The unit on the job working in abrasive dust benefits from checked boots, intact guards and clean breathers, all of which are quick to verify.

Handover and documentation for a machine built for the work

Handover should include the documents as well as the keys. Parts list, service schedule and the operator notes for the equipment in service are what the workshop needs in month six, and they are much harder to obtain later. Keeping the manuals where they can be reached matters. The tiller whose documents stay with the machine gets serviced on schedule; one whose paperwork was filed elsewhere tends to run on memory instead.

tracked farming tractor view 7

Track undercarriage and ground pressure on this class of machine

The track is what makes the machine usable on soft ground. A wider track spreads the weight of a machine of this size over more area and lowers ground pressure, which is the difference between working after rain and waiting for the field to dry. Cleaning the undercarriage is part of the job. Mud and straw packed into the track frame of the unit in daily use increases rolling resistance and accelerates wear, and a few minutes at the end of the day prevents it.

Running the equipment on site in a mixed fleet

Orchard, vineyard and row crop use of tracked farming tractor tracked farming tractor

Fleet value comes from interchangeability. Operators who can step between machines without retraining, and a workshop that stocks one set of filters, keep utilisation higher than a fleet of individually optimised units. Utilisation matters more than the purchase decision over a few years. The machine itself that sits idle ties up the same yard space standing still as one that earns, so the buying decision should follow the hours the machine will realistically work. Standardising where possible simplifies everything downstream. When several units of the model in question share a service schedule and a parts list, the fleet becomes easier to plan and easier to sell on at replacement time.

Paddy field and wet land work with the machine in that duty

Paddy work changes the specification. The unit on the job intended for flooded ground needs sealed hubs, a higher air intake and flotation that keeps it on the surface, and those are build items rather than things to add later.

Customisation and build options for a machine built for the work

Build options are where a standard machine becomes the right machine. Colour, guarding, lighting, seating and hydraulic provisions can usually be set at build time on the equipment in service, and are far simpler then than as a retrofit. Customisation should still be limited to what the work needs. Each addition to the tiller is another item to maintain, so the useful question is not what can be added but what the job list actually requires.

Wear items and life of this class of machine

Wear rate follows conditions far more than hours. The unit in daily use working on abrasive ground or in mud will consume undercarriage or tyre life much faster than the same machine on clean ground.

Cab, canopy and operator comfort on a machine of this size

Visibility from the seat decides working quality. Being able to see the rotor and the edge of the pass from the equipment on site is what gives a straight, even working width without repeated correction.

Storage and downtime care for the machine itself

Before-storage preparation prevents most return-to-work faults. Draining or treating fuel, protecting exposed rods and relieving pressure where the maker specifies it are the items worth an hour when the model in question is parked. A periodic start is better than none. Running the machine in that duty to operating temperature during a long layoff keeps seals and the charging system in better condition than leaving it untouched until the next job.

Reference data for the unit on the job

The models below cover the crawler rotary tiller range. Power, working condition, engine series and track width are confirmed together, because the field the machine works in decides the track and the engine before the working width matters.

Model data for tracked farming tractor
ModelWorking conditionTrack widthEngine seriesInduction
100 hp wet and dry field crawler rotary tillerwet and dry field350 mm——
80 hp wet and dry field crawler rotary tillerwet and dry field—495 seriesturbocharged
70/75 hp wet and dry field crawler rotary tillerwet and dry field—490 seriesturbocharged
60 hp wet and dry field crawler rotary tillerwet and dry field—495 series—
60 hp dry field crawler rotary tillerdry field—495 series—
130 hp paddy field crawler rotary tillerpaddy field350 mm——
50 hp wet and dry field crawler rotary tillerwet and dry field—490 series—
80 hp wet and dry field crawler rotary tillerwet and dry field—495 seriesturbocharged

Implements and options for a machine built for the work

Options and implements for tracked farming tractor
ItemNote
rotary tiller , 1.8 m working width , 125 gearbox—
simple cab—
vine burying machine—
centre trencher—
rotary tiller , 1.6 m working width , 125 gearbox—
land leveller2.2 m -4.4 mworking width 2.2 m
dozer blade—
1.5 m straw returningworking width 1.5 m

Fuel, oil and fluid quality for the equipment in service

Fluid quality is a storage problem before it is a machine problem. Water and sediment in a drum will find the injection system of the tiller eventually, and a settling period is nothing compared with a pump.

Later additions and retrofits on this class of machine

Retrofitting is limited by the base machine. Before anything is added to the unit in daily use the hydraulic flow, the mounting interface and the stability allowance have to be checked, because those limits are what decide what is sensible.

Commissioning a machine of this size on site

The first hour on site should be slow. Before the equipment on site is put to work the fluid levels are rechecked after transport, the fasteners are gone over and the machine is run light so that anything loosened in transit shows up early.

Reading the early symptoms on the machine itself

Operators notice things first because they hear the machine every day. Encouraging the person on the model in question to report small changes, and acting on them, is the most effective maintenance programme there is.

Hot, humid and dusty conditions around the machine in that duty

Tropical operation is a specification question as much as a maintenance one. The cooling capacity, the sealing and the corrosion protection fitted to the unit on the job are what make the difference once the ambient temperature rises.

Moving a machine built for the work between sites

Travel time is not working time, and it should be planned as its own item. The hours spent moving the equipment in service between jobs are hours not worked, and a trailer that matches the machine reduces them every single trip.

Cold weather and winter care for the tiller

Cold exposes weak batteries, thick oil and water in the fuel. Preparing this class of machine for winter means the right grade of oil, a battery in good condition and fuel that will not wax in the tank overnight.

Pre-delivery inspection before the unit in daily use leaves the shop

The last hour before packing is the best time to find a fault. Running a machine of this size through its full working cycle, checking for leaks under load and confirming that the controls match the specification avoids a conversation across time zones later.

Every line above comes from the build sheet for the equipment on site, and the final configuration is confirmed against the working conditions and the destination before production.

E-mail:sales@mingycn.com

LINE(ID):mingyicn

Related pages

hillside farming tractor · tracked tractor with 3 point hitch · diesel tricycle for agriculture · Crawler Type Rotary Tiller

Related machinery

View all products

Contact Form

Click to refresh