Off Road Water Tanker
Off Road Water Tanker Off Road Water Tanker Off Road Water Tanker Off Road Water Tanker Off Road Water Tanker Off Road Water Tanker Off Road Water Tanker Off Road Water Tanker
Product Information

Off Road Water Tanker

Several forms of the dumper appear in this range, and the right one depends on the ground more than on the brochure. Below, the practical differences are set out alongside the figures so the two can be read together.

Parts, service and support for off road water tanker

Parts availability usually decides the engine and the brand. A machine built around components the local network already carries is serviced from stock, which is the difference between a day lost and a week lost.

off road water tanker view 1

Farm and estate use of off road water tanker

Farm work is seasonal and varied. This class of machine that hauls feed in one month and muck or aggregate in the next earns its place by being usable across the year rather than by being optimised for one task. Ground on farms is often soft and often shared with livestock. The unit in daily use working there needs to cross pasture without rutting it badly, and tyre and weight choices follow from that. Farm users also value simplicity. A machine of this size that can be serviced in the yard with common tools and common parts suits a farm better than one that needs a dealer visit for routine work.

Soft ground, paddy fields and mud with off road water tanker

Parts, service and support for off road water tanker off road water tanker

Four-wheel drive is only part of soft ground capability. Tyre choice, ground clearance and weight distribution decide whether the equipment on site keeps moving in a paddy field or a marsh, and all three are specified rather than assumed. Soft ground punishes the wrong tyre. Mountain pattern tyres on the machine itself clear mud that a road pattern would pack with, and the difference is measured in whether the machine finishes the day.

Wear items and life of off road water tanker

Certain parts are designed to be consumed. Knowing which items on the model in question are wearing parts, and roughly how long they last in the duty the machine sees, turns replacement into a plan rather than a breakdown. Wear rate follows conditions far more than hours. The machine in that duty working on abrasive ground or in mud will consume undercarriage or tyre life much faster than the same machine on clean ground.

off road water tanker view 3

Forestry and timber work with off road water tanker

Timber work changes what the vehicle carries. The unit on the job fitted with a log grab loads and unloads without a second machine, which is usually the reason a forestry contractor specifies one over a conventional truck. Access tracks in forestry are narrow, soft and often steep. A machine built for the work chosen for that work is chosen for the track, and the body, cab and tyre specification follow from the route rather than from the load alone.

Payload and how a off road water tanker is loaded

Farm and estate use of off road water tanker off road water tanker

Loading method affects the machine as much as the load does. Material dropped from height into the equipment in service shocks the frame and the body floor, while material placed evenly spreads the load and extends body life. The honest payload figure comes from the duty. The dumper working a smooth haul road carries differently from one crossing ruts and gradients, and the conservative number is the one that keeps the machine working.

Load, ballast and stability on off road water tanker

Stability follows the load and its position. Knowing the rated capacity of this class of machine at the working radius, rather than at its best case, is what keeps handling predictable and the machine upright. Ballast and attachment weight change the machine. Adding a heavy tool to the unit in daily use moves the centre of gravity, and the counterweight or configuration should be matched to the tool rather than assumed.

off road water tanker view 5

Lighting and low light operation of off road water tanker

Planning helps more than extra lamps. Positioning the machine of this size so that the work is lit from the machine side, and keeping the route clear, does more for safety than adding light to a badly planned task.

Fuel use and running demands of the equipment on site

Soft ground, paddy fields and mud with off road water tanker off road water tanker

Fuel is usually the largest controllable running demand. Operating style, correct tyre or track condition and a clean air supply all move consumption on the machine itself by more than most buyers expect. Planning the work to reduce empty movement is free. Fewer repositioning cycles on the model in question means less fuel, less wear on the undercarriage or tyres and more of the shift spent on productive work.

Tipping body and unloading on the machine in that duty

The tipping body is the part that does the work. The unit on the job specified with twin hydraulic rams and a tailgate that opens under load unloads in one pass, which matters more on a short haul than top speed does. Unloading method should follow the material. Wet spoil, aggregate and green timber behave differently in the body, and matching the body and tailgate arrangement to the load is what keeps a machine built for the work cycling rather than being hand-cleared. Body size is a compromise with access. A larger body on the equipment in service carries more per trip but needs more room to turn and tip, so the useful question is how many trips the route allows rather than how much it holds.

off road water tanker view 7

Mixer drum bodies and concrete haulage the dumper

Carrying concrete changes the duty entirely. This class of machine with a mixer drum is working against the clock, and the specification follows the delivery distance and the site access rather than the load alone. Drum bodies need power and stability. The unit in daily use set up for concrete has to carry the drum, the load and the water, and the frame and brakes should be specified for that combined weight. Cleaning and discharge are part of the job. A machine of this size used for concrete is judged on how quickly it can discharge and wash out, because that turnaround is what the site is paying for.

Gradient and climbing ability of the equipment on site

Wear items and life of off road water tanker off road water tanker

Gradient is where a haul vehicle earns its keep. The machine itself with a crawler gear and a low range climbs loaded where a road vehicle would need a second attempt, and that difference decides whether a track is usable at all. Descending matters as much as climbing. A loaded the machine in that duty on a steep gradient needs engine braking and brakes in good order, and the safe practice is to plan the descent before the load rather than during it. Ground and gradient together set the limit. Loose surface on a slope reduces what the model in question can pull regardless of engine power, so the surface survey belongs before the specification.

Attachments and working tools for the unit on the job

The base machine is only as useful as the tool on the end of it. Matching the attachment to the task - rather than to what arrived with the machine - is what lets one a machine built for the work cover several jobs across a week.

Configuration data for the equipment in service

The configurations below are the build sheets most often matched to the dumper. Engine, gearbox, axles, frame and body dimensions are confirmed together, because the body size and the axle rating have to suit the load before the engine rating matters.

#12.Standard18.Standard20.Luxury22.Luxury
1Two-cylinder diesel engine, 38 hpFour-cylinder 4102 turbocharged diesel engineFour-cylinder 4102 turbocharged diesel engineFour-cylinder 4105 turbocharged diesel engine
2Full-time gearbox with four-wheel driveModel 140 part-time gearbox with four-wheel driveModel 140 part-time gearbox with four-wheel driveModel 145 part-time gearbox with four-wheel drive
3High/low range with crawler gearHigh/low range with crawler gearHigh/low range with crawler gearHigh/low range with crawler gear
4Simple cabSimple cabFully enclosed cabFully enclosed cab
5Oil brakesOil brakesSix 825R16 steel-belted radial tyresSix 825R16 steel-belted radial tyres
6Four 700-16 mountain tyresSix 700-16 mountain tyresReinforced ISUZU-pattern front axleReinforced ISUZU-pattern front axle
7Front axle 212Reinforced ISUZU-pattern front axleReinforced 1080 rear axleReinforced 1080 rear axle
8Rear axle 130Reinforced 1061 rear axleAir cut-off brakesAir cut-off brakes
9Reinforced 60 x 140 mm square tube frameReinforced 80 x 180 mm square tube frameReinforced 80 x 180 mm square tube frameReinforced 80 x 180 mm square tube frame
10Rear body 2.2 m long x 1.5 m wide x 0.45 m highRear body 2.2 m long x 2.1 m wide x 0.45 m highRear body 3.0 m long x 2.2 m wide x 0.45 m highRear body 3.0 m long x 2.2 m wide x 0.45 m high
11Tailgate with self-dumping functionTailgate with self-dumping functionTailgate with self-dumping functionTailgate with self-dumping function
12Hydraulic power steeringHydraulic power steeringSide-opening rear body tailgate with cab ladderSide-opening rear body tailgate with cab ladder
13Twin hydraulic ramsTwin hydraulic ramsHydraulic power steeringHydraulic power steering
14Two-person comfort seatTwo-person comfort seatTwin hydraulic ramsTwin hydraulic rams
15Twin-battery electric startTwin-battery electric startTwo-person comfort seatTwo-person comfort seat
16Round-nose bonnetSquare-nose bonnetHeavy-duty thickened leaf springsHeavy-duty leaf springs
17——Twin-battery electric startTwin-battery electric start
18——Square-nose bonnetSquare-nose bonnet
19——Four-cylinder 4105 turbocharged—
20——Four-cylinder 4108 turbocharged—
21——Single-cylinder engine, 25 hp—
22——Single-cylinder engine, 28 hp—
23——Single-cylinder engine, 32 hp—
24——Two-cylinder engine, 38 hp—
25——Four-cylinder 490 engine—
26——Four-cylinder 4102 turbocharged engine—

Fuel, oil and fluid quality for this class of machine

Fluid quality is a storage problem before it is a machine problem. Water and sediment in a drum will find the injection system of the unit in daily use eventually, and a settling period is nothing compared with a pump.

Hot, humid and dusty conditions around a machine of this size

Dust is the enemy of every rotating joint. Keeping the radiator and the air intake of the equipment on site clean, and cleaning them before they are blocked rather than after, is what separates a machine that lasts from one that overheats.

Reading the early symptoms on the machine itself

The symptom is usually not at the fault. A hydraulic function that has become sluggish on the model in question may point to a filter, a relief setting or a pump, and starting with the simple checks avoids the wrong guess.

Storage and long idle periods for the machine in that duty

Standing still is harder on a machine than working. Preparing the unit on the job for a long idle period means clean fluids, a charged battery and protection for the exposed surfaces, because neglect is not the same as rest.

Wear items and spares worth holding for a machine built for the work

A spares list should follow the duty cycle. The equipment in service working every day in abrasive dust consumes filters and cutting edges far faster than the same machine used once a week, and the shelf should be stocked for the harder case.

Handover and getting familiar with the dumper

The first day with a new machine sets the pattern for the next five years. Handover for this class of machine covers the control layout, the daily check points and the limits the operator needs to know before the first real load is lifted or carried.

Later additions and retrofits on the unit in daily use

An added function should pay for itself quickly. Whether a machine of this size gains a different bucket, a hydraulic service or a protection package, the test is the number of days a year it is actually used.

Every line above is a build item rather than an optional extra, and the final sheet for the equipment on site is confirmed against the destination, the ground and the load before production.

E-mail:sales@mingycn.com

LINE(ID):mingyicn

Related pages

rural water tanker truck · off road water transport truck · Static Hydraulic Front Dump Truck: Site Transport Duties · Four Wheel Drive Transport Vehicle

Related machinery

View all products

Contact Form

Click to refresh